| 1. |
Design & Site Co-ordination. |
| 2. |
Consultation on selection lightings, furnishings, accessories, etc. |
| 3. |
Proposal of choice of Materials. |
| 4. |
Furniture layout planning & Perspective drawing. |
| |
|
| 5. |
Demolish existing Floor tiles. |
| 6. |
Demolish existing wall tiles. |
| 7. |
Dismantle & dispose existing Kitchen cabinet. |
| 8. |
Application of waterproof membrane. |
| 9. |
Supply & lay Homogeneous/Ceramic floor tiles. |
| 10. |
Supply & lay Ceramic wall tiles up to ceiling level. |
| 11. |
Construct cabinet base c/w tiles skirting. |
| 12. |
Construct fridge & washing machine base. |
| 13. |
Plumbing Works. |
| 14. |
Run inlet & outlet pipes for sink & washing machine. |
| 15. |
Run new copper pipes for Sink & washing machine. |
| 16. |
Provide installation of Sink & Sink mixer. |
| |
|
| 17. |
Kitchen cabinet in selected laminate with ABS trimmings. |
| 18. |
30 ft Top & bottom includes:- |
| |
- 1 set of stainless steel dish rack
- Cutlery tray
- 2 no frosted glass door
- Imported designer handles
- 1 chest drawers
- Postformed Table top
|
| |
|
| 19. |
Reinstate electrical wiring. |
| 20. |
Chemical wash. |
| 21. |
HDB permit application. |
| 22. |
Haulage & clearing of debris. |
| 23. |
Supply 1 no Stainless Steel double bowl sink. |
| 24. |
Supply 1 no sink mixer.
|